The problem

\[\sum_{g \thinspace:\thinspace \mathrm{bus}(g) = b} p_{s,g} \quad+\quad \sum_{\ell \thinspace:\thinspace \mathrm{to}(\ell) = b} f_{s,\ell} \quad-\quad \sum_{\ell \thinspace:\thinspace \mathrm{from}(\ell) = b} f_{s,\ell} \quad=\quad d_{s,b}\]

Each sum is over the lines or generators a coordinate map sends to bus \(b\)\(\mathrm{bus}\), \(\mathrm{to}\) and \(\mathrm{from}\) are the coordinates the dimensions declare, not sets in their own right. Load is \(d\) here, because \(\ell\) is already the line index.

The model

The same model, as math

Sets

Symbol Meaning
\(\mathcal{S}\) index \(s\) --- snapshot --- dispatch periods
\(\mathcal{G}\) index \(g\) --- generator with \(\mathrm{bus}: \mathcal{G} \to \mathcal{B}\) --- generating units
\(\mathcal{B}\) index \(b\) --- bus --- network nodes
\(\mathcal{L}\) index \(\ell\) --- line with \(\mathrm{from}: \mathcal{L} \to \mathcal{B},\enspace \mathrm{to}: \mathcal{L} \to \mathcal{B}\) --- transmission lines, each joining two buses

Parameters

Symbol Meaning
\(\bar p\) p_max over \(\mathcal{G}\) --- installed capacity
\(c\) cost over \(\mathcal{G}\) --- marginal cost
\(\bar f\) cap over \(\mathcal{L}\) --- forward transmission limit
\(\underline{f}\) neg_cap over \(\mathcal{L}\) --- reverse transmission limit
\(d\) load over \(\mathcal{S} \times \mathcal{B}\) --- demand at each bus

Variables

Symbol Meaning
\(p\) p over \(\mathcal{S} \times \mathcal{G}\) --- output of generator \(g\) in snapshot \(s\)
\(f\) f over \(\mathcal{S} \times \mathcal{L}\) --- flow on line \(\ell\), signed towards its to bus

Objective

total_cost

\[\min \sum_{s \in \mathcal{S},\enspace g \in \mathcal{G}} p_{s,g} \cdot c_{g}\]

Subject to

balance

\[\sum_{g \in \mathcal{G} \thinspace:\thinspace \mathrm{bus}(g) = b} p_{s,g} + \sum_{\ell \in \mathcal{L} \thinspace:\thinspace \mathrm{to}(\ell) = b} f_{s,\ell} - \left( \sum_{\ell \in \mathcal{L} \thinspace:\thinspace \mathrm{from}(\ell) = b} f_{s,\ell} \right) = d_{s,b} \qquad \forall\thinspace s \in \mathcal{S},\enspace b \in \mathcal{B}\]

Variable domains

p

\[0 \le p_{s,g} \le \bar p_{g} \qquad \forall\thinspace s \in \mathcal{S},\enspace g \in \mathcal{G}\]

f

\[\underline{f}_{\ell} \le f_{s,\ell} \le \bar f_{\ell} \qquad \forall\thinspace s \in \mathcal{S},\enspace \ell \in \mathcal{L}\]
dimensions:
  snapshot:
    dtype: int
  generator:
    dtype: str
    coords: [bus]  # every generator sits on a bus
  bus:
    dtype: str
  line:
    dtype: str
    coords: {from: bus, to: bus}  # both endpoints are buses

parameters:
  p_max:
    dims: [generator]
  cost:
    dims: [generator]
  cap:
    dims: [line]
  neg_cap:
    dims: [line]
  load:
    dims: [snapshot, bus]

variables:
  p:
    foreach: [snapshot, generator]
    bounds:
      lower: 0
      upper: p_max
  f:
    foreach: [snapshot, line]
    bounds:
      lower: neg_cap
      upper: cap

# Naming the two halves of the nodal balance. Pure substitution before either
# backend sees the model, so this costs nothing at build and nothing at solve —
# what it buys is a constraint that reads as the sentence it is.
expressions:
  gen_at_bus: group_sum(p, over=generator, by=bus)
  net_inflow: group_sum(f, over=line, by=to) - group_sum(f, over=line, by=from)

constraints:
  balance:
    foreach: [snapshot, bus]
    expression: gen_at_bus + net_inflow == load

objectives:
  total_cost:
    sense: minimize
    expression: p * cost

What it exercises

Three group_sum calls, and they are what a network is in this language. A dimension can carry coordinatesgenerator carries bus, line carries from and to — and group_sum(f, over=line, by=to) sums along a line's to coordinate, landing the result on bus. The same f is summed twice through two different coordinates, once as an inflow and once as an outflow.

No adjacency matrix, and no join written by the modeller: the topology is data on the dimension.